Nigeria SONCAP certification required to prepare the information

2016-04-18

Applicants are required to prepare the following documents for application:
Customer application form
Reliable product inspection report, must be approved by the ISO 17025 has the relevant test quality (such as: ISO 8528) issued by the laboratory test report issued in three years;
Product technical parameters
Appearance photo; (front, back, and side)
nameplate and stickers;
Explosion or structure diagram;
Packing photos (on the outer package shall be "in China Made")
English Specification
Parts list
Note: the voltage and frequency of Nigeria are: two phase 230V (+ 4%) ~ 50Hz, three-phase to: 415V.

prev: Nigeria SONCAP certification introduction

next: SONCAP certification of the two methods of |SONCAP certifica...

relation news